MECHANICAL PACKAGE:

$ 2 Million

BUILD PERIOD:

1 Years

INDUSTRY SECTOR:

Education

LOCATION:

Nathan, Queensland

PROJECT TYPE:

Construct Only

QUANTITY OF HVAC Assets:

43

projects - griffith uni

SYSTEM:

  • Coolmaster completed the laboratory refurbishment to multiple levels. This included Full Dilapidation report of existing central plant and BMS system.
  • Fume Cupboards complete with multiple PVC risers & stacks
  • Chilled Water Air Handling Units complete with pipe reticulation
  • Chemical Cabinetry Exhaust Systems
  • Laboratory Gas Installation to Argon, Nitrogen and Vacuum complete with all isolation boxes and bottle arrangements.
  • Commissioning and Certification to PC2 Laboratory Requirements
  • Built to PC2 and PC3 containment requirements with positive and negative pressure rooms.

ABOUT THE PROJECT:

Ranked one of the top 3 university’s globally Griffith University – Nathan campus is situated on tranquil bushland on the edge of the Toohey Forest.

The campus hosts more than 13,000 students an offers degrees in business and government, engineering and information technology, environment, humanities and languages, law, and science and aviation.

The campus also has fully catered and self-catered accommodation options, plus a range of sporting facilities.